Checklist 01 · Actual-State Read · Before you plan

The current-state map is not the current state.

Treat the documentation as a claim to verify against the work before planning begins.

Tick what already holds. Everything left becomes a numbered work plan you can assign and print.

10 conditions Kept in this browser only.
Why it matters

Read a department and you find complaints. Read a unit of work and you find where conversion actually stops.

What to do

Name the unit of work — a contract, a requisition, an order, a change — and scope the read to it.

Why it matters

Documented process describes intent. The gap between intent and behavior is the finding you are looking for.

What to do

Trace three real instances end to end before reading any process documentation.

Why it matters

Accepting documentation as baseline imports every error in it and hides every workaround around it.

What to do

Mark each documented step as verified, contradicted or unobserved, with a date and a source.

Why it matters

Target state pulls the read toward the plan you already have, which is how enablement requirements get missed.

What to do

Box the target-state material and agree not to reference it until the read is signed off.

Why it matters

The org chart shows who is accountable. It does not show who actually does the work or decides.

What to do

List every actor in the flow and record how each was verified — observed, interviewed or assumed.

Why it matters

Reads that stop at Do describe activity. Prove and Improve are where value is confirmed or quietly lost.

What to do

Extend the read past delivery: how is the outcome proven, and what changes as a result?

Why it matters

Correcting a bypass mid-read destroys the evidence of why it exists. The bypass is usually rational.

What to do

Log each bypass with its trigger and who uses it. Correct nothing until the read is complete.

Why it matters

Each side of a seam believes it handed over something complete. Both accounts are needed to see the gap.

What to do

Interview both sides of every handoff separately and record where the two accounts diverge.

Why it matters

An undated, unattributed finding cannot survive challenge, and challenge is guaranteed.

What to do

Attach a date and a named source to every finding before it goes in the report.

Why it matters

Frequency measures who talked most. Conversion impact measures what is actually costing you.

What to do

Re-rank the findings by where conversion breaks, and state the weighting basis.

ZBTOS · Checklist 01
The actual-state read — open items
 
 
Your work plan

Open items

Assign an owner and a date, then print. Only the open items print.
#Do thisOwnerBy when
ZBTOS™ by ETEGY · zbtos.com/actual-state-read.html · Conditions drawn from published doctrine. Published in full.

Gaps wider than your team can close?

An assessment tells you how wide. Foundation teaches your people to close them without buying the read again.